How it runs

Twenty-two
weeks.

From the first measure to the day you cook on it. Here is every stage, and what it costs you in time.

01

Consultation — week one

Ninety minutes in your kitchen. We measure, photograph, and ask how you actually use the room: who cooks, how many at once, what you own that never fits anywhere. No drawings, no charge, no obligation.

02

Concept and fixed quote — weeks two to four

Two layout options in plan and elevation, with a finishes board and a fixed price against each. If neither is right we redraw once at no cost. Most people choose here.

03

Detail documentation — weeks five to eight

Every cabinet drawn at 1:20, every service located, every appliance confirmed against its actual cut-out. This is the stage other companies skip, and the reason their sites run late.

04

Fabrication — weeks nine to sixteen

Joinery is built in our Richmond workshop while your stone is templated and cut. Nothing is demolished at your place yet — you keep a working kitchen.

05

Site — weeks seventeen to twenty-one

Strip-out, services, install, stone, tiling, and paint. Four to five weeks with the room out of action. We set up a temporary bench and sink elsewhere in the house on day one.

06

Handover and the ninety-day visit

We walk the room with you and fix the list. Then we come back at three months, because timber moves in its first season and doors want a second adjustment.

Week seventeen

The week the room disappears. We set up a temporary bench elsewhere on day one.

4

Weeks your kitchen is out of action. Not five, not nine — the joinery is finished before we demolish anything.

1:20

The scale every cabinet is drawn at before fabrication. This is the stage that keeps sites on time.

90

Days after handover we come back, because timber moves in its first season.

On variations

The number in your contract is the number on your invoice. If that is not true, someone quoted badly and it should not be your problem.

The honest part

What can go wrong,
and what we do.

Stone slabs crack at the fabricator. Imported appliances arrive six weeks late. Nineteenth-century floors turn out to have no bearing where the island was going.

All three have happened to us. In each case the fix was ours to wear, not yours — that is what a fixed price actually means. You will hear about a problem from us on the day we find it, not in week twenty.

Timing

The parts people ask about

Can we live in the house during the build?

Yes, and most clients do. The four weeks without a kitchen are the hard part, not the noise — we work standard hours and the site is cleaned every evening.

What happens if an appliance is late?

We hold the install date and fit the surrounding joinery with a temporary panel, then return to swap it. You are not left with an open hole for six weeks.

Do you need us on site?

Twice. Once at the pre-start walkthrough, once at handover. Everything else runs by email.